Ceili Shawl by Tabetha Hedrick

Ceili Shawl

Knitting
April 2013
Fingering (14 wpi) ?
16 stitches and 28 rows = 4 inches
in Stockinette Stitch, heavily stretched during blocking.
US 6 - 4.0 mm
480 - 500 yards (439 - 457 m)
One Size
English
This pattern is available from piscesknits.blogspot.com for $7.50.

It’s been an amazing experience designing independent knitting patterns these last 12+ years. And throughout it, the many life changes, including a fantastic full-time job, have pulled me from my ability to maintain the upkeep and customer service needed. I’ve decided to close the store and retire all the patterns. It may not be forever, but I need to follow my heart towards other projects for now.

My patterns and pattern support will no longer be available after August 1, 2021.

Until that date, please enjoy a closing discount of 50% off on all patterns (no coupon code needed). Thank you for so many years of support and knitting!

Delectable cables and a stunning leaf lace decorate the border of the Ceili Shawl. With a lilting, light stitch pattern, knitters will delight in the delicate, airy dance of stitches.

My patterns are filled with beautiful photos, easy to read text, eye-catching layout, and everything you need to know in order to complete the project. Ceili Shawl has both written and charted instructions for your own preference!

skill level
Intermediate

finished measurements
72” / 183 cm wide, 21” / 53.5 cm deep

yarn
480 yd / 439 m Fingering Weight CYC #1

Sample shown in:
Shibui Staccato Sock (191 yds / 175 m per 2 oz / 50 g ball; 65% superwash merino, 30% silk, 5% nylon): #104 light blue, 3 skeins.

needles
Size 6 US (4 mm) 32”/ 80 cm circular needles
Adjust needle size if necessary to obtain correct finished gauge.

notions
(2) Stitch markers, tapestry needle

finished gauge
16 sts and 28 rows = 4” / 10 cm in Stockinette Stitch, heavily
stretched during blocking.
Please note that while gauge is not critical to the finished piece, it does affect the finished size of the shawl and amount of yarn used. Adjust this in your planning.